Integrated Marine Informations System - IMIS

Persons | Institutes | Publications | Projects | Datasets | Maps
[ report an error in this record ]basket (0): add | show Print this page

De inpassing van de Barbierbeek in het gecontroleerde overstromingsgebied Kruibeke-Bazel-Rupelmonde
Hettinga, O.; Van der Welle, J.; van Oevelen, D.; Meire, P. (1998). De inpassing van de Barbierbeek in het gecontroleerde overstromingsgebied Kruibeke-Bazel-Rupelmonde. Rapport Instituut voor Natuurbehoud, 98(22). Instituut voor Natuurbehoud: Brussel. XIV, 92 pp.
Part of: Rapport Instituut voor Natuurbehoud. Instituut voor Natuurbehoud: Brussel, more

Available in  Authors | Dataset 
Document type: Project report

Keywords

Authors  Top | Dataset 
  • Hettinga, O.
  • Van der Welle, J.
  • van Oevelen, D., more
  • Meire, P., more

Abstract
    This report deals with the possibilities to fit the Barbier-brook in the Controlled lnundation Area of Kruibeke, Bazel en Rupelmonde that was planned according the Sigmaplan. The so called CIA-KBR is situated upstream Antwerp. The CIA-KBR will be inundated when a certain flood on the river Schelde overflows the lowered river dike. The result is a decrease of the peak of the flood. A dike at the polder side will fulfill the defensive function during the period of inundation. This dike is called the "ringdike". The Barbier-brook cuts through the CIA-KBR. Within the CIA the Barbier-brook is diked in since the 13th century. Further on in this text these dikes will be called Barbier-brook dikes. Nowadays, the area between these dikes forms the storage for the Barbier-brook.The study participates in the preparations for the CIA-KBR. Co-ordinated by the Institute of Nature Conservation in Brussels some studies for possibilities of nature development within the CIA-KBR are carried out.In this report the technical possibilities to fit the Barbier-brook in the CIA-KBR as weIl as the perspectives for nature developrnent are studied. The perspectives for nature development can be split in:.nature development influenced by the Barbier-brook.nature development influenced by the Barbier-brook and a controlled reduced tide, controlled reduced tide stands for: a tide controlled by culverts for the in- and outlet of water from the river Schelde with a reduced tide amplitude with an average of 0,25 to 0,5 m.This last perspective corresponds most to the historical natural situation of the area, which consists of freshwater marshes and mud plains.To be able to work out these aspects it is necessary to carry out also a study ofthe water quality and quantity of the Barbier-brook.No discharge data from the Barbier-brook are known at all. Based on the discharge data of the Kleine Molenbeek near Liezele, which has a similar catchment area except the size, the discharge frorn the Barbier-brook could be abstracted. To do so, the surface area of the Kleine Molenbeek is multiplied by a factor 1,43. Frorn these discharge data follows a mean discharge of the Barbier-brook which varies seasonally between 3 and 5 m3/s. These data show also an increase in the annual maximum 24h-discharges starting from approximately 1980.The quality of the water of the Barbier-brook off the CIA-KBR is very bad. The brook is heavily polluted with domestic, industrial and agricultural wastewater. Nearby the site where the brook discharges into the Schelde it is characterised as "biologically dead". The involved communities have made sewerage plans which will decrease the pollution of the Barbier-brook with dornestic wastewater with about 80%. Concerning the houses which are not covered by the sewerage plans the following measures are given: 1) yet inc1ude into the sewerage plans, and 2) provide small-scale biological treatment.After completion of the sewerage plans and the extra measures the following reductions of the pollution by wastewater on the Barbier-brook could be reached:dornestic wastewater: 92%; industrial wastewater: 90%; agricultural wastewater: 31 %To make it technically possible to fit the Barbier-brook in the CIA-KBR it is necessary to compensate the storage of the Barbier-brook in order to prevent the brook to cause trouble at the houses of Bazel that stand close to the brookside. For this reason the following measures will be elaborated:The realisation of a storage along the ringdike which is connected with the CIA by means of a culvert. The surface needed for the storage is regulated by the maximum water level that is tolerated in the storage. From calculations follows that there is enough place to realise a storage that can guarantee a safety for a situation with a return period of 1 per 1000 years. No houses need to be removed.The realisation of a storage in the natural valley of the Barbier-brook situated upstream Bazel and the CIA. This storage needs to be fit in the protected landscape without large works. From calculations follows that the available storage volume is insufficient to guarantee a safety for a situation with a return period of 1 per 1000 years.Placing a pumping station at the ringdike with sufficient capacity to pump over a discharge of the Barbier-brook with a return period of 1 per 400 years which is 8,7 m3/s. It is technically possible to reach this with a "screw-up-pumping station" as well as with a "screw-centrifugal-pumping station”Not until the quality of the water of the Barbier-brook improves strongly, nature development can be effectively worked out. In this study the following perspectives for nature development are elaborated in order to increase the value of nature in that part of the CIA that can be influenced by the Barbier-brook:.Concerning the area between the Barbier-brook dikes possible measures are worked out to improve the present potential values of nature. Thus rich zones along the Creek of Kruibeke can be expected and the higher grounds will be rich in flowering plants. When the dikes around the Barbier-brook are preserved the introduction of a controlled reduced tide is of no influence concerning nature development of the Barbier-brook..Concerning a part of the polder of Kruibeke space will be created for development of a more natural Barbier-brook. The agricultural activities on the other grounds will be preserved. Different measures will make this possible of which one is the removal of the Northern Barbier-brook dike. There will be aimed towards broad and rich developed zones along the brook with gradation in vegetation types. The introduction of a controlled reduced tide is not considered because of the present function of agriculture in the polder ..Concerning the polders of Kruibeke and Bazel measures are worked out to provide a total free development of the Barbier-brook. The most effective measure to reach this is the removal of the Barbier-brook dikes except that part of the dikes between the new ringdike and the natural height in the polder of Bazel. There will be a striving towards a large scaled landscape dominated by reeds and rich developed wetlands. The introduction of a controlled reduced tide is of great influence of the nature development in this situation. It might even re sult in freshwater marshes and mud plains in the CIA-KBR.

Dataset
  • ME-6b. Yearly spatial autumn monitoring dataset mudflat Groot Buitenschoor, more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors | Dataset