Integrated Marine Informations System - IMIS

Persons | Institutes | Publications | Projects | Datasets | Maps
[ report an error in this record ] Print this page

Opvolging externe effecten DGD

Funder identifier: WL 00_015 (Other contract id)
Principal funding codes: 5114 - Department of Mobility and Public Works
Period: May 2010 till July 2023
Status: Completed

Thesaurus terms Coastal and estuarine hydraulics; Dredging; Numerical modelling; Numerical modelling and design; Sedimentation; Sedimentology; Siltation
Geographical term: Belgium, Zeeschelde, Antwerp Harbour, Deurganck Dock [Marine Regions]
 Institutes | Publications 

Institutes (4)  Top | Publications 
  • Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Vlaams Ministerie Mobiliteit en Openbare Werken; Departement Mobiliteit en Openbare Werken; Waterbouwkundig Laboratorium (WL), more, executant
  • Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Vlaams Ministerie van Mobiliteit en Openbare Werken; Departement Mobiliteit en Openbare Werken; Afdeling Maritieme Toegang, more, proposer
  • International Marine & Dredging Consultants NV (IMDC), more, partner
  • Deltares, more, partner

Abstract
Opvolgen van de door aMT uitbestede opdracht externe effecten DGD. Uitvoering gebeurt door IMDC, WL zetelt in begeleidingsgroep en adviseert aMT.

Vervolg van studies onder 596/XX.

Publications (30)  Top | Institutes 
  • Antea Belgium (2014). Evaluatie van de externe effecten op de aanslibbing in het Deurganckdok 2012-2014: deelrapport 2.15. Zout-slib meetjaar 8: 1/04/2013 - 31/03/2014. Versie 1.0. Departement Mobiliteit en Openbare Werken, Afdeling Maritieme Toegang: Antwerpen. 32 + appendices pp., more
  • Antea Belgium (2014). Evaluatie van de externe effecten op de aanslibbing in het Deurganckdok 2012-2014: deelrapport 2.17. Kalibratie OBS3A sensoren d.d. 24/07/2013. Versie 1.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 22 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares (2016). Evaluation of the external effect on the siltation in Deurganckdok (2012 -2014): report 1.16. Analysis of external effects on siltation processes and factors. Version 3.0. Flemish Government. Maritime Access Division: Antwerp. 134 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.3. Through tide Sediview measurements during spring tide: entrance Deurganckdok - Winter 2012. Versie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. V, 258 pp., more
  • International Marine and Dredging Consultants (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.2. Through tide Sediview measurements during neap tide: entrance Deurganckkok Autumn 2011. Version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. V, 228 pp., more
  • International Marine and Dredging Consultants (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.6. Through tide measurements: Eddy currents during spring tide at DGD Autumn 2011. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. VI, 187 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.7. Through tide measurements: Eddy currents during spring tide at DGD winter 2012. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. VI, 172 pp., more
  • International Marine and Dredging Consultants (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.12. Calibration of mobile and stationary instruments on 16 March 2011. Versie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. II, 27 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 1.3. Annual sediment balance April 2011 - March 2012. Verie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 238 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 1.6. Overview of boundary conditions in the river Scheldt April 2011 - March 2012. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 39 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 1.5. Overview of boundary conditions in the river Scheldt april 2010 - march 2011. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. IV, 129 pp., more
  • International Marine and Dredging Consultants (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.13. Calibration of stationary instruments on June 1st, 2012. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. VI, 29 pp., more
  • International Marine and Dredging Consultants (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.10. Salt silt and current distribution entrance Deurganckdok: frame measurements and through tide measurements Autumn 2011. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. VI, 288 pp., more
  • International Marine and Dredging Consultants (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.1. Through tide Sediview measurement during spring tide: entrance Deurganckdok Autumn 2011. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. V, 255 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.11. Salt silt and current distribution entrance Deurganckdok: frame measurements and through tide measurements: winter 2012. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. VI, 360 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report: 2.4. Through tide Sediview measurements during neap tide: entrance Deurganckdok Winter 2012. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 268 pp., more
  • International Marine and Dredging Consultants (2014). Evaluation of the external effects on the siltation in Deurganckdok (2012-2014): report 1.14. Analysis of the boundary conditions in survey years 5 and 6: 01/04/2010 - 31/03/2012. version 3.0. Flemish Government. Maritime Access Division: Antwerp. 213 pp., more
  • International Marine and Dredging Consultants; Deltares (2014). Evaluation of the external effects on the siltation in Deurganckdok (2012-2014): report 1.13. Analysis of the boundary conditions in survey years 5 and 6: 01/04/2008 - 31/03/2010. version 3.0. Flemish Government. Maritime Access Division: Antwerp. 250 pp., more
  • International Marine and Dredging Consultants; Deltares (2015). Evaluation of the external effects on the siltation in Deurganckdok (2012-2014): report 1.10. Annual sediment balance in survey year 8: April 2013 - March 2014. Version 2.0. Flemish Government. Maritime Access Division: Antwerp. VI, 292 pp., more
  • International Marine and Dredging Consultants; Deltares (2014). Evaluation of the external effects on the siltation in Deurganckdok (2012-2014): report 1.12. Boundary conditions survey year 8: April 2013 - March 2014. version 2.0. Flemish Government. Maritime Access Division: Antwerp. iii, 241 pp., more
  • International Marine and Dredging Consultants (IMDC); Deltares (Deltares); Flanders Hydraulics Research (WL) (2018). Evaluation of the external effects on the siltation in Deurganckdok (2014-2017): report 1.25. Report 1.25. Model study of transient and external effects. Version 1.0. Flemish Government. Maritime Access Division: Antwerp. 32 pp., more
  • International Marine and Dredging Consultants; GEMS International (2011). Evaluation of the external effects on the siltation in Deurganckdok. Report 1.1: Annual sediment balance April 2009 - March 2010. Version 3.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. VI, 36 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2011). Evaluation of the external effects on the siltation in Deurganckdok: report 1.4: overview of boundary conditions in the river Scheldt April 2009 - March 2010. Versie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. IV, 118 pp., more
  • International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok. report 1.2: Annual sediment balance April 2010 - March 2011. Versie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerp. 45 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares (2014). Evaluation of the external effects on the siltation in Deurganckdok: report 2.9. Salt-silt distribution Deurganckdok 1/6/2011-30/05/2012. Versie 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 170 pp., more
  • International Marine and Dredging Consultants; Deltares (2014). Evaluation of the external effects on the situation in Deurganckdok (2012 -2014): report 1.09. Annual sediment balance in survey year 7: April 2012 - March 2013. Version 2.0. Flemish Government. Maritime Access Division: Antwerp. VI, 279 pp., more
  • International Marine and Dredging Consultants; Deltares (2014). Evaluation of the external effects on the situation in Deurganckdok (2012 -2014): report 1.11. Boundary conditions survey year 7: April 2012 - March 2013. Version 2.0. Flemish Government. Maritime Access Division: Antwerp. iii, 236 pp., more
  • International Marine and Dredging Consultants; Deltares (2014). Evaluation of the external effects on the situation in Deurganckdok (2012 -2014): report 1.8. Analysis of external effects on siltation processes and factors. Version 3.0. Flemish Government. Maritime Access Division: Antwerp. x, 129 + appendices pp., more
  • International Marine and Dredging Consultants (2011). Externe effecten deurganckdok: deelrapport 1. Syntheserapport van het Current Deflecting Wall onderzoek. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. 20 + appendices pp., more
  • International Marine and Dredging Consultants; Deltares (2010). Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing - Evaluatie van de externe effecten op de aanslibbing in Deurganckdok: report 2.5. Through tide measurement: Eddy currents DGD 02/03/2010. Versie 3.0. Waterbouwkundig Laboratorium: Antwerpen. III, 51 pp., more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Institutes | Publications